Limited time: $250 off projects over $2,500 — free estimates in 48 hours
All posts

Fence and Repaint Order for Multi-Unit Properties

October 27, 2026 9 min read
CommercialHOAPlanning
Fence and Repaint Order for Multi-Unit Properties

On an HOA or multi-unit property, paint the walls that sit within a ladder's or lift's reach of the new fence line first, then build the fence, and build the fence first only where it stands well clear of the buildings. The fence line, the gate openings and the painters' equipment all want the same strip of ground, so the order is really a question of who needs that strip first.

Updated October 27, 2026, by Carolina Fencing Solutions. We install fencing around Huntersville, Cornelius, Davidson and Mooresville. This guide is for the property manager, HOA board or owner with a fence going in and buildings that also need paint. It carries no prices.

Key takeaways

  • The deciding measurement is the distance from the new fence line to the nearest wall to be painted. Close means paint first. Far means fence first.
  • Gate openings set which trades can get in. Set the gate posts early and hang the leaves last.
  • Spray before finish. Powder-coated aluminum, vinyl-coated mesh and fresh stain are all easier to protect by finishing the spraying before they exist.
  • Pre-1978 buildings carry lead-safe rules for anyone paid to disturb paint, so scrape before post holes are dug.
  • Put both trades on one calendar, so tenants hear about noisy days and blocked parking once.

Which goes first, the fence or the paint?

Most properties have both situations at once, so decide building by building, using the distance from the planned fence line to the nearest wall that will be painted.

LayoutUsual orderWhy
Fence runs along a building wall, within reach of a ladder or liftPaint first, then fenceLifts, scaffolds and spray rigs need the strip the fence will take. A finished fence leaves a gap too tight to work in.
Perimeter or boundary fence well clear of every buildingFence firstThe two crews do not compete for ground, and the fence settles where the gates and entrances are.
Enclosure built against a wall, such as a dumpster padPaint the wall, then build the enclosureThe enclosure hides the surface behind it.
New fence replaces an old one along the buildingsTear out, paint, then buildThe old panels block the wall. Set an end date for the open stretch so it is not left unprotected.
Fence is the only barrier, such as around a poolFence first, protectedDo not leave the opening unprotected while waiting for paint. Cover or mask the new fence instead.
How the order changes with the layout of the property

The close case catches people. A lift, a scaffold or even a ladder needs a working strip along the wall, and a finished fence a few feet off that wall takes the strip away.

The reverse order has its own cost. Auger spoil, ready-mix splash and wheelbarrow traffic all land at the base of a wall that was just finished. Around Lake Norman the spoil is Piedmont red clay, and red clay on fresh paint is a stain that stays until somebody washes it off.

Galvanized chain link fence with horizontal privacy slats beside a commercial building
Galvanized chain link with privacy slats, from the gallery on our chain link page.

The far case is simpler: a perimeter fence well clear of the buildings does not share ground with the paint crew. For commercial sites, our chain link page lists commercial-grade systems, and our aluminum page lists commercial and industrial grades with matching gates.

Gate openings and fence line clearances

Gates decide whether the other trades can get onto the site at all, so settle them before the first post. Ask each trade for its widest piece of equipment and set the opening from that, not from what a pickup needs.

Who or what passesSettle before the first post
Painters' lift, scaffold or spray rigWidest piece, the route from the gate to each wall, and where it is parked overnight
Fence crew's mixer, auger and material truckWhere they stage, and which walls and lawns they cross to reach the line
Delivery, trash and recycling trucksWhether the opening is wide enough, and the days those trucks run
Residents on foot or with mobility aidsA clear width that meets the standard below, with no equipment blocking it
Fire and EMS accessAsk the local fire code official before you lock in the width, the swing or the lock
Who passes through the opening, and what to settle in writing

For pedestrian gates on an accessible route, there is a published number. The 2010 ADA Standards for Accessible Design, section 404.2.3, says:

Door openings shall provide a clear width of 32 inches (815 mm) minimum.U.S. Department of Justice, 2010 ADA Standards for Accessible Design, section 404.2.3

The section measures swinging openings with the door open 90 degrees. Whether it applies to a given gate is a question for the owner or architect, but it is a useful floor, and a lift or a loaded dolly needs more.

Gate type changes the clearance too. Our gates page describes cantilever slide gates as suited to commercial sites where swing room is limited, and says swing gates need clear arc space. Where cars park along the fence, the arc is often what cannot be cleared. The same page says we handle permitting with the county or the HOA when it is required, including engineered drawings for commercial and crash-rated installations.

Two installers holding a gate post plumb with a level in fresh concrete
Gate posts get plumbed and braced while the footing sets. AI-generated illustration.

To keep the opening usable, set the gate posts early and hang the leaves last. Ask any fence contractor whether they would run the job that way.

Spray, overspray and the fence you just paid for

Spray drifts, and a fence finish does not take it kindly. Our property fencing page covers perimeter styles, and the aluminum page describes a powder-coat finish built to resist chips, scratches and humidity. That finish is a factory coating, and dried paint on it is a cleanup job nobody wants to order.

The cleanest protection is the order itself: finish the spraying before the panels and stain go up. If the fence is already in, ask the painter before the lift arrives:

  • Which surfaces will be sprayed, and which brushed or rolled near the fence?
  • What wind conditions end a spray day, and who makes that call?
  • How will the fence and gate hardware be masked, and who pays to clean overspray?
  • When does the last coat go on, and when can fence work begin?

Older buildings: lead-safe prep comes before the digging

The EPA Renovation, Repair and Painting program page says that approximately three-quarters of the homes in the United States built before 1978 still contain some lead-based paint. It also says that, in general, anyone paid to perform work that disturbs paint in housing and child-occupied facilities built before 1978 must be certified in lead-safe work practices, and that property management companies that perform work that disturbs paint in a pre-1978 residential building must become a lead-safe certified firm.

What follows is our inference, not EPA's wording. If the walls beside the fence line will be scraped, sanded or stripped, do that before anyone digs: chips are easier to clean up from bare ground than from under spoil piles and concrete. Ask the painter whether the buildings predate 1978, and for the firm's lead-safe certification if they do.

Underground lines on a shared property

NC811 says to contact it three working days before you plan to dig, and that the utilities then send locators to mark their publicly managed underground lines for free. Private lines are another matter, and a multi-unit property tends to have many: irrigation, parking and site lighting, gate operator power, and conduit for the access system. Whoever digs should place the ticket, and the property manager should flag the private lines before layout.

Scheduling around tenants and the HOA board

Tenants mind noise, blocked parking and not knowing what is happening. An auger day, a concrete truck day and a spray day each disrupt differently, so give each its own notice and keep them off the same building together. When the fence runs close to the walls, this order keeps the schedule readable:

  • Walk the site together: manager, painter and fence contractor. Mark the fence line, gate openings, wall strips and staging areas on one plan.
  • Place the 811 ticket, and keep it current if digging slips.
  • Paint first, building by building or elevation by elevation: prep, then coats, with notices to residents ahead of each.
  • After the last spray day and the wash-down, tear out any old fence and set posts.
  • Hang the panels, then the gate leaves and operators last.
  • Finish with a final walk: swing every gate, test every latch, and write one punch list for both trades.

Line the painter up before you set the fence date, not after. One local option for that trade is Chris' Painting & Remodeling in Monroe, NC, whose page for commercial painters in Charlotte, NC lists offices, store fronts and multi-tenant buildings, work scheduled around business hours, a phase plan agreed in writing, and one named contact. Whichever painter you choose, ask for the same things and keep one calendar.

Planning a fence for an HOA or multi-unit property in Huntersville, Cornelius, Davidson or Mooresville? Bring the painter's schedule to the first walk.

Questions about fencing and repainting the same property

Should the fence or the paint come first?

Paint first where the fence line is close enough to a wall that a lift or spray rig needs the strip the fence will take. Build the fence first where it stands well clear of the buildings.

Can the fence go in while the buildings are being painted?

It can, if the fence line is clear of the walls being worked and the crews do not share a gate on the same day. Keep fresh fencing out of the spray zone.

How wide should a gate be for painters' equipment?

Ask the painter for the widest piece of equipment and set the opening from that. For pedestrian gates on an accessible route, the 2010 ADA Standards set a clear width of 32 inches minimum, and equipment usually needs more.

Do older buildings need anything special before a fence goes up?

If the walls beside the line were built before 1978 and will be scraped or sanded, the EPA's lead-safe rule applies to anyone paid to disturb that paint. Do that work before digging.

Who calls 811 on a multi-unit property?

Whoever is digging should place the ticket, three working days before the work begins, according to NC811. The utilities mark public lines, not private ones, so flag irrigation, lighting and gate power before layout.

Free estimate

Planning a fence in the Lake Norman area?

Get a written, itemized quote — usually within 48 hours. We handle permits, HOA review, and shoreline approvals.

Get my free estimate
Keep reading

More local guides